top of page
CABISOL_HD_Version_1636x1636__1_-removebg-preview.png

Explore Cabisol

Electrical & Automation Solution for 144 MLD Water Treatment Plant

  • Feb 18
  • 2 min read

Updated: Feb 27

Project Overview


Client & Location

End User: Uttar Pradesh Jal Nigam

Project Location: Agra, Uttar Pradesh

Plant Capacity: 144 MLD Water Treatment

Plant Year of Execution: 2012


Project Partners

Main Contractor: Triveni Engineering &

Industries Ltd., Noida

Electrical & Automation Contractor: CABISOL

Segment: Water Municipal Water Treatment



Client Requirement & Background


The 144 MLD Water Treatment Plant at Agra was a critical municipal infrastructure project aimed at supplying safe and treated drinking water to a large urban population.


The project demanded:


Complete Electrical Power Distribution

Comprehensive power distribution system for entire plant operations


Reliable Automation & Control System

Advanced control systems for seamless plant operation


Continuous Operation

Minimum downtime with 24×7 operational capability


Compliance Standards

Meeting government utility standards and regulations


Proven Execution Capability

Track record for large-capacity WTPs


The main contractor, Triveni Engineering & Industries Ltd., required a technically competent partner who could execute Electrical and Automation works seamlessly under strict timelines and quality norms.



CABISOL – Scope of Work


CABISOL was awarded the complete Electrical & Automation scope for the Water Treatment Plant, covering end-to-end execution.


1.Electrical System Supply & Execution

  • LT Power Distribution Panels

  • MCCs for process and utility drives

  • Power cabling, earthing, and field wiring

  • Electrical installation, testing, and commissioning


Automation & Control System


2.Automation&ControlSystem

  • PLC-based automation for complete WTP process

  • Control of major treatment units including:

  • Raw water pumping

  • Clarifiers

  • Filters

  • Backwashing systems

  • Chemical dosing systems

  • Sequential control and interlocking logic


  1. Raw Water Pumping

Automated control of intake pumps


  1. Clarifiers

Process monitoring and control


  1. Filters

Filtration system automation


  1. Backwashing Systems

Sequential backwash control


  1. Chemical Dosing

Precise dosing automation


Instrumentation & SCADA Systems


  1. Instrumentation

Field instruments for:

  • Flow

  • Level

  • Pressure

  • Process monitoring


Integration of all field signals into PLC system


4.SCADA & Monitoring


Centralized SCADA system for:

  • Plant operation

  • Alarm & event monitoring

  • Equipment status visualization


Operator-friendly HMI screens


Testing, Commissioning & Handover


  1. Testing, Commissioning & Handover


  • Loop Checking- Loop checking and logic validation

  • Commissioning - Cold & hot commissioning

  • Performance Validation -Performance validation under full load

  • Training & Handover - Operator training and documentation handover



Solution Highlights


Single-Point Responsibility

Complete Electrical + Automation integration


24×7 Operation

Designed for continuous municipal operation


Robust Architecture

Reliable MCC and control systems


User-Friendly SCADA

Intuitive interface for utility operators


Full Compliance

Meeting UP Jal Nigam and government standards



Project Outcome


  • Successful commissioning of 144 MLD Water Treatment Plant

  • Stable and reliable operation meeting designed capacity

  • Improved operational efficiency and ease of plant control

  • High satisfaction of EPC contractor and end user

  • Long-term operational reliability for municipal water supply


The project strengthened CABISOL reputation as a dependable partner for large-scale water infrastructure projects.



Why This Case Study Strengthens CABISOL Water Portfolio


  • Proven experience in large-capacity municipal WTPs

  • Expertise in Electrical + Automation integration

  • Trusted by leading EPC contractors

  • Strong execution capability in government utility projects

  • Long-standing operational performance reference (since 2012)



Conclusion


The 144 MLD Water Treatment Plant for UP Jal Nigam, Agra, executed in association with Triveni Engineering & Industries Ltd., stands as a strong testament to CABISOL capability in delivering reliable, scalable, and fully integrated Electrical & Automation solutions for the Water Segment.


This project, along with other water infrastructure references, clearly establishes CABISOL as a preferred technology partner for municipal and industrial water treatment projects across India.


 
 
 

Comments


bottom of page